Panel on the shaker system
Our Capabilities · Berlin Tegel

Built here. In series.

From bare cell to integrated system.

8Arrays in orbit
1 MWCapacity per year
TRL 9Qualification level
ProductionOur line in Berlin
Bonding head with ring light above a solar cellCell stringing
Gantry dispenser laying down cells on a carbon-fibre flight panelCell lay-down
Technician in cleanroom gear at the lay-down lineLay-down line
Qualification and TestingUnder our roof
Qualification modules in the thermal shock chamberQualification modules in thermal shock chamber
Electrodynamic shaker system with slip tableShaker system
AM0 test benchAM0 test bench
Solar cell contacted in the AM0 test fixtureCell under test
01

Thermal Shock and Thermal Vacuum Chamber

Thermal shock, thermal cycling and thermal vacuum testing of cells, modules and complete panels in-house — qualification on the same site as production.

02

Shaker

Mechanical qualification under launch loads on our own shaker system — hinges, hold-downs and bonded panels tested before delivery.

03

AM0 test bench

Developed in-house: IV curves under AM0 light, electroluminescence and diode tests for every cell and module, with a report per serial number.

HeritageFlight-proven
Technology demonstration in spaceProven in orbit on several missions

Proven in orbit.

Our structures and processes carry flight heritage, and our own hardware has been operating in orbit since 2024.

Since 2024Own hardware in orbit
Visit the line

Come and see for yourself.

We're happy to walk you through the line in Berlin Tegel.